For advice, call UW Employee Health Center (206.685.1026) or the Washington Poison Center (800.222.1222). Eye contact - Flush eyes with water as a precaution.Skin contact - Wash off with soap and plenty of water.If not breathing, give artificial respiration. Inhalation - If breathed in, move person into fresh air.Prevent from entering drain or otherwise being released into the environment. Don respirator, lab coat, gloves, and eye protection if spill is outside fume hood. Store in original container.Īvoid dust formation. Use M圜hem, the UW EH&S chemical inventory database, for more details on storage within the lab suite. PHS - Decontamination - After making the chromium chloride in HCl solution, make sure all glassware is rinsed with waste going into your labeled waste container.Ĭhromium III chloride hexahydrate must be stored in 303B on the north wall on shelf #8. Keep container tightly closed when not in use. PHS - Don lab coat, nitrile gloves, and eye protection before grabbing the bottle. Wear a laboratory coat, gloves, and eye protection. PHS - No administrative controls are required. PHS - Any fume hood in the IsoLab suite will be sufficient. Place one of the mobile balances into the fume hood for weighing this chemical. ![]() Ensure the fume hood has proper air flow by checking the flow rate on the control panel and / or using a smoke match or wipe to visualize flow. Use chromium III chloride hexahydrate in a fume hood. While you should consider Elimination and Substitution, this SOP assumes the bottom three are directly applicable and described in this section. ![]() Protection - SDS The Hierarchy of Hazard Controls. Toxic to aquatic life with long lasting effects.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |